Environmental and Social Impact Assessment (ESIA) of the Prinos Offshore Development Project



 The Project consists of:

  • The re-entry of nine existing wells on the Prinos Alpha platform and the sidetracking of these to new bottom-hole locations in the Prinos field.

  • The re-entry of one existing Prinos North extended reach well located on the Prinos Alpha platform.

  • The design, fabrication, installation, commissioning and subsequent operation of a new well-head jacket platform (“Lamda”), approximately 3.5km NW of the existing Prinos platforms.

  • Lamda will host between 5 and 9 wells that will be drilled into and produce from the Epsilon field. Lamda has been designed to be normally unmanned.

  • Three sub-marine pipelines that connect Lamda to Prinos Delta.