Public Consultation in Bar, Montenegro

Energean has always been operating close with its Stakeholders. On November 1st, we participated in the Public Consultation organized by the Montenegrin Government in the Municipality of Bar.



Energean will conduct a 3D seismic survey in early 2019. Ahead of the survey, the Company participated in the Public Consultation in order to inform the local community about the project and to present the Environmental Impact Assessment (EIA) that was submitted to the Montenegrin authorities on October the 1st.

You can download full EIA from https://epa.org.me/2018/10/03/5633/

Scope of the EIA is to assess the project potential generated impacts  on the environment receptors/indicators

The structure of an EIA is composed by:

1) Project description

2) Environmental Baseline – Study of the existing conditions

3) Environmental Impact Assessment

4) Mitigation Measures

5) Environmental Monitoring Programme (EMP)

You can download Energean's presentation of the EIA from here (English) and from here.